一级片免费观看-一区二区三区在线看-女女互慰揉小黄文-久草免费资源-制服诱惑一区-亚洲另类春色-日韩av中字-日日爱886-91精品专区-色屋永久-国产精品无码av一区二区

The first PV Top Runner Program of HT-SAAE is successfully connected to the grid

Source:HT-SAAERelease time:2017-09-30 Page view:25922

On September 29, the first PV Top Runner Program of HT-SAAE -- 50MW photovoltaic power generation project in Yangquan, Shanxi was successfully connected to the grid with full capacity.


Located in Pingtan town on the outskirts of Yangquan City, Shanxi Province, the project covers an area of about 1,500 Mu with an average annual production capacity of about 62155MWh.


The project builders overcame the difficulties of complex construction environment, large construction difficulty and tight schedule grid connection project, and finally completed the grid connection before September 30 with the support from various parties.


The successful full capacity grid connection of the project not only means that the high bidding price of RMB 0.88 per kilowatt-hour (kWh) is retained, but also lays a foundation for HT-SAAE to participate in the competition of Yangquan phase 2 Top Runner Program, which is of great significance to the development of aerospace PV in Shanxi Province in the future.


Text/Zhang Yu Photo/Chen Chen

 

Project site scene


Contact: Zhang Lan, Eighth Research Academy HT-SAAE

Tel: 86-18721614238

Address: 8F, Astronautics Building (South), No.222, Caoxi Road, Xuhui District, Shanghai